Bridge over Nahal Ada


Bridge over Nahal Ada

The bridge is located on Route 6531 over the Nahal Ada creek, at the entrance to Jisr al-Zarqa. The bridge replaced an old bridge built in the 50s and in poor physical and functional condition. In order not to disrupt the traffic on the road, a temporary bypass was prepared to replace the existing bridge. Work included the demolition of the old bridge and construction of a new bridge while determining the layout of the creek banks. Water flows in the stream in the wet season so it was necessary to work during the dry season as much as possible and avoid disturbing the regular flow.

 

Client: Department of Public Works - Ministry of Transport

 

Supervision: I.T.B. Ltd.

 

Starting Date: May 2003

 

Delivery Date: November 2003

 

Scope of Implementation: Approximately 4 million NIS

 

Location: Route 5631 (connecting Route 4 to the village of Jisr al Zarqa)

 

 

Mode of Execution

Preparatory work included land leveling, excavation work, subgrade tightening and filling needed for a temporary bypass. Lighting systems were moved to the temporary bypass. To build the new bridge, temporary lining works were executed and reinforced concrete foundations were cast on site. In addition, work involved piles, walls, wing walls, access plates, railings installation, drainage work and casting and paving the bridge pavement.